FBE/2FBE Pipe External Coating Production Line

new time£º2015/3/7 10:06:02


 

FBE/2FBE Pipe External Coating Production Line

 

Note£º1¡¢Pipe incoming rack  2¡¢Spiral conveyor for blasting line  3¡¢Gas preheating furnace  4¡¢Pipe external blasting machine  5¡¢Blasted pipe outgoing rack  6¡¢Pipe internal blowing device  7¡¢Inspection platform  8¡¢Linear conveyor for waste pipe return  9¡¢Waste pipe return rack  10¡¢Spiral conveyor for coating line  11¡¢IF heating device  12¡¢FBE spraying device  13¡¢Cooling tower device  15¡¢Pipe coating cooling room  16¡¢Coated pipe outgoing rack  17¡¢End-of-pipe treatment device  18¡¢Finished pipe outgoing rack

 

 

Technical Parameter

S.N.

Name

Technical parameters

1

Pipe diameter

¦µ101¡«¦µ1219mm

2

Pipe length

8¡«12.5m

3

Voltage¡¢frequency

380v/220v¡¢50HZ

4

Total power

About 4300KW

5

Air pressure

0.4¡«0.6Mpa

6

The compressor pressure/throughput

0.8Mpa/10X2m3

7

Water consumption

2% of the total water amount

8

Productivity

300-400m2/hr

 

contact

Langfang Dingsheng Mechanical Equipment Co., Ltd

Tel£º86-0316-2207771

86-0316-2207773

Tel£º18831688900

Fax£º86-0316-2231218

E-mail:dshjx@vip.sina.com

Add£ºNO. 198, AI'MIN ST. EAST, LANGFANG£¬HEBEI, CHINA